Tauhara Instrumentation Pipework

Tauhara Instrumentation Pipework

Force Engineering were heavily involved in the fabrication of instrumentation pipework at Contact Energy’s new geothermal development – Tauhara Power Station.

A testament to their skill, our qualified ASME IX welders had a 100% success rate with over 300 stainless welds passing Non Destructive Testing everytime, both in position on site & workshop fabricated welds. 

A critical line for monitoring of geothermal pressures into the Turbine, and all 316 Stainless Steel, the welds ranged from flanges to valves, sockets to gauges, and everything inbetween. 

 

 

Need something made?